Core Heating System Reapair at Los Angeles Air Force Base

Project: Building Core Heating System Repair

Location: Los Angeles Air Force Base

Value: $2M

Owner: Department of the Air Force

Services Provided: Pearls Construction consultants worked with the construction GC to develop the comprehensive detailed construction critical path method time schedule on Primavera P6 planning software together with schedule cost loading, manpower and resources loading, cash flow projection, monitoring cost performance and monthly and weekly construction schedule progress updates.

Work Scope: Heating, Ventilation and Air conditioning (HVAC) system upgrades, including BACnet Direct Digital Controls and Electrical upgrades at Buildings 270 and 271 at the Los Angeles Air Force Base.

Go back to the Portfolio Page

Have a similar project? Ask for a free quote: