Pearls construction management and CPM scheduling consultants Chicago, Illinois provided construction services and CPM scheduling. Our team worked with the construction GC. They developed comprehensive detailed school construction CPM scheduling on Primavera P6 scheduling software.
First, “Developing Work Breakdown Structures (WBS)”. WBS is used to list all utility, engineering, and construction activities that are broken down by phases, areas, and types of work.
It included also running several what-if scenarios. In order to optimize the sequence of operations and developing the logic, sequence, and diagrams to avoid high float values. Our Consultants in Chicago tested and analyzed the longest path of the project. Then they assigned direct Crew to all construction activities and identify man-hours throughout the job. They also provided the status of potential resources available and their feasibility to the project in Chicago and developed and analyzed the resource profile histogram to level resources.
CPM scheduling is a project modeling technique for scheduling a set of project activities. CPM Scheduling requires gathering sufficient data about the activities, as specified in the contract pertaining to the project. Followed by identifying their logical sequence and dependencies on one another, the type of connections between them, and their expected durations and lead time.
Second, Cost analysis included allocating cost estimates to individual work items to establish a cost baseline. Our Team in Chicago developed, monitored, and reported the construction budget. Furthermore, they monitored the project cost performance for all construction and engineering activities. They also updated the forecasted cash flow using the earned value techniques. Pearls construction consultants also provided balancing cost codes for all activities in consistence with bid items to add up to the total amount and were monitoring cost performance while detecting the variances from planned in the construction schedule.